Skip to main content
Installation Report
DVIA-M Series
12-19-2022

Ningbo Institute of Materials Technology ZEISS GeminiSEM 360 DVIA-M1000 (220825R4) Installation Report — 2022.12.19

DVIA-M Series
Installation Report
Ningbo Institute of Materials Technology
ZHEJIANG
ZEISS
GeminiSEM 360
SEM
DVIA-M1000
220825R4

Ningbo Institute of Materials Technology

(M1000_ 220825R4 Set up)

Target equipmentGeminiSEM 360
Place of installationZHEJIANG
RemarkGood Performance
END USERNingbo Institute of Materials Technology
Operator: Lee, Young Ha Date of setup: 22.12.19 Date of reporting: 23.01.17Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2022.12.19 (Monday),

Operator

DAEIL SYSTEMS, Youngha Lee

Place of measurement

ZHEJIANG

Equipment Model

GeminiSEM 360

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-19-2022
Tags
DVIA-M Series
Installation Report
Ningbo Institute of Materials Technology
ZHEJIANG
ZEISS
GeminiSEM 360
SEM
DVIA-M1000
220825R4