Installation Report
DVIA-M Series
04-07-2023
Xiamen Jiumu Yanfa Apreo 2C HiVac DVIA-M1000 (220718R10) Installation Report
DVIA-M Series
Installation Report
XIAMEN JIUMU YANFA
DVIA-M1000
220718R10
Apreo 2C HiVac
Xiamen
Contents
XIAMEN JIUMU YANFA
XIAMEN JIUMU YANFA
(M1000_ 220718R10 Set up)
Site checklist
| Target equipment | Apreo 2C HiVac |
|---|---|
| Place of installation | Xiamen |
| Remark | Good Performance |
| END USER | XIAMEN JIUMU YANFA |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 23.04.04
Date of reporting: 23.04.07
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.04.04 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Xiamen
Equipment Model: Apreo 2C HiVac
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-07-2023
Tags
DVIA-M Series
Installation Report
XIAMEN JIUMU YANFA
DVIA-M1000
220718R10
Apreo 2C HiVac
Xiamen
Related Case Studies

DVIA-M Series
YIMO Thermo Fisher SEM Apreo 2C HiVac DVIA-M1000 (240919R1) Installation Report
11-06-2024Read more

DVIA-M Series
East China Microelectronics Thermo Fisher Apreo 2C HiVac DVIA-M1000 (230602R4) Set-up Report — Hefei
07-05-2024Read more

DVIA-M Series
Cathay Biotech Apreo 2C HiVac DVIA-M1000 (230824R1) Installation Report
10-19-2023Read more