Skip to main content
Installation Report
DVIA-M Series
04-07-2023

Xiamen Jiumu Yanfa Apreo 2C HiVac DVIA-M1000 (220718R10) Installation Report

DVIA-M Series
Installation Report
XIAMEN JIUMU YANFA
DVIA-M1000
220718R10
Apreo 2C HiVac
Xiamen

XIAMEN JIUMU YANFA

XIAMEN JIUMU YANFA

(M1000_ 220718R10 Set up)

Site checklist

Target equipmentApreo 2C HiVac
Place of installationXiamen
RemarkGood Performance
END USERXIAMEN JIUMU YANFA

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.04.04

Date of reporting: 23.04.07

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.04.04 (Tuesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Xiamen

Equipment Model: Apreo 2C HiVac

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date04-07-2023
Tags
DVIA-M Series
Installation Report
XIAMEN JIUMU YANFA
DVIA-M1000
220718R10
Apreo 2C HiVac
Xiamen