ShanghaiTech University DVIA-M1000 (220628R2) Setup Report

DVIA-M Series
Installation Report
ShanghaiTech University
DVIA-M1000
MB1000
220628R2
SHANGHAI

Installation site photo

Overview

Target equipmentTBD
Place of installationSHANGHAI
RemarkGood Performance
END USERShanghaiTech University

Operator: Lee, Sang Jae

Date of setup: 22.12.19

Date of reporting: 22.12.28

Date of business trip : 17.12.27~17.12.29

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.12.19 (Monday),

Operator: DAEIL SYSTEMS, Sangjae Lee

Place of measurement: SHANGHAI

Equipment Model: TBD

Serial number: 220628R2

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-28-2022
Tags
DVIA-M Series
Installation Report
ShanghaiTech University
DVIA-M1000
MB1000
220628R2
SHANGHAI