Skip to main content
Installation Report
DVIA-M Series
12-28-2022

Sigma300 DVIA-M1000 Installation Report (Dongguan, 220607R1, 2022)

DVIA-M Series
Installation Report
DVIA-M1000
DVIA-ML1000
Sigma300
Dongguan
220607R1

END USER

Dongguan Huasheng Vacuum Coating Technology Co., Ltd

M1000_ 220607R1 Set up

Set-up photograph

Target equipment

Sigma300

Place of installation

Dongguan

Remark

Good Performance

Operator

Lee, Sang Jae

Date of setup

22.12.19

Date of reporting

22.12.28

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2022.12.23 (Friday)

Operator: DAEIL SYSTEMS, Sangjae Lee

Place of measurement

Dongguan

Equipment Model

Sigma300

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-28-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
DVIA-ML1000
Sigma300
Dongguan
220607R1