Installation Report
DVIA-M Series
11-08-2021
ZOLIX DVIA-M1000 MB1000 P254 (210610R1) Installation Report — 2021.11.08
DVIA-M Series
Installation Report
ZOLIX
MB1000
DVIA-M1000
210610R1
P254
Contents
MB1000 P254 210610R1
Target equipment and site
| Target equipment | N/A |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
Reporting schedule
Operator: Choi, HyoungMun
Date of setup : 21.11.05
Date of reporting : 21.11.08
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.11.05 (THU)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: N/A
Measurement conditions and results
Summary of measurement results
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -28 dB | -25 dB | -23 dB |
| X | -21 dB | -32 dB | -24 dB |
| Y | -21 dB | -23 dB | -25 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-08-2021
Tags
DVIA-M Series
Installation Report
ZOLIX
MB1000
DVIA-M1000
210610R1
P254


