Installation Report
DVIA-M Series
12-23-2021
YIMO Thermofisher Apreo DVIA-MB1000 (211020R5) Installation Report — 2021.12.23
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211020R5
Thermofisher
Apreo
MB1000
Contents
MB1000 P269 211020R5
Site checklist
| Target equipment | Thermofisher Apreo |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
Operator and dates
Operator: Choi, HyoungMun
Date of setup: 21.12.22
Date of reporting: 21.12.23
Date of business trip : 17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.12.22 (WED)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement: N/A
Equipment Model: Thermofisher Apreo
Summary of measurement results
Test Condition: Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -28 dB | -24 dB | -23 dB |
| X | -40 dB | -30 dB | -32 dB |
| Y | -26 dB | -35 dB | -35 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-23-2021
Tags
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211020R5
Thermofisher
Apreo
MB1000
Related Case Studies

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022Read more

DVIA-M Series
Xi'an Jingke ZEISS GeminiSEM 300 DVIA-MB1000 (210326R6) Installation Report — 2021.11.23
11-23-2021Read more

DVIA-M Series
YIMO SILAN ZEISS CROSSBEAN350 MB1000 P250 DVIA-MB1000 Internal Program — SN 210812R2 — 2021.10.28
10-29-2021Read more