Skip to main content
Installation Report
DVIA-M Series
07-21-2022

Chinese Academy of Sciences — Institute of Physics Thermofisher Helios G5 Beijing DVIA-M1000 (210928R3) Installation Report

DVIA-M Series
Installation Report
Chinese Academy of Sciences
Institute of Physics
Thermofisher
Helios G5
BEIJING
DVIA-M1000
210928R3

Institute of physics, Chinese Academy of Sciences(中科院物理所)

Institute of physics, Chinese Academy of Sciences(中科院物理所)

(M1000_ 210928R3 Set up)

Site checklist

Target equipmentThermofisher Helios G5
Place of installationBEIJING
RemarkGood Performance
END USERInstitute of physics, Chinese Academy of Sciences(中科院物理所)

Operator and dates

Operator: Lee, Young ha Date of setup: 22.07.21 Date of reporting: 22.07.21Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Platform serial: M1000_ 210928R3 (DVIA-M1000).

Measurement conditions and results

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
FloorBBB
Above ActiveDED

Good omnidirectional performance.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

N/A

MB1000 internal program — X axis

N/A

MB1000 internal program — Y axis

N/A

Octave Band Result

Octave band result — Z axis

N/A

Octave band result — X axis

N/A

Octave band result — Y axis

N/A

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-21-2022
Tags
DVIA-M Series
Installation Report
Chinese Academy of Sciences
Institute of Physics
Thermofisher
Helios G5
BEIJING
DVIA-M1000
210928R3