Skip to main content
Installation Report
DVIA-M Series
08-10-2021

无锡英诺赛思 ZEISS Sigma 300 DVIA-MB1000 (P235) Internal Program Performance — 2021.08.10

DVIA-M Series
Installation Report
Wuxi
ZEISS
Sigma 300
DVIA-MB1000
P235
MB1000

(MB1000 P235 Set up)

Target equipmentZEISS Sigma 300
Place of installation无锡英诺赛思科技有限公司
RemarkGood Performance
END USER无锡英诺赛思科技有限公司
Operator: Choi, HyoungMunDate of business trip : 17.12.27~17.12.29
Date of setup : 21.08.10Date of reporting : 21.08.10

Overview

Overview After Active mounting, measure the vibration environment to check that there is no problem in using the equipment. Measurement date: 21.08.10 (THU) Operator: Daeil System, Research engineer Choi, HyoungMun Place of measurement : 无锡英诺赛思科技有限公司 Equipment Model: ZEISS Sigma 300

Measurement conditions and results

Summary of measurement results

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date08-10-2021
Tags
DVIA-M Series
Installation Report
Wuxi
ZEISS
Sigma 300
DVIA-MB1000
P235
MB1000