Installation Report
DVIA-M Series
06-09-2021
YIMO remote tuning — Inner Mongolia Univ. Talos F200 DVIA-MB3000 (201216R1-5 P17) — 2021.06.09
DVIA-M Series
Installation Report
YIMO
DVIA-MB3000
201216R1-5
P17
Talos F200
Thermo Fisher
Inner Mongolia University
Contents
(MB3000_201216R1-5(P17) Set up)
Target equipment
Talos F200
Place of installation
NeiMengGu
Remark
Good Performance
END USER
内蒙古大学
Operator
Munho Noh
Date of setup
21.06.09
Date of reporting
21.06.09
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.06.09 (WED)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement
NeiMengGu
Equipment Model
Talos F200
Measurement conditions and results
Summary of measurement results
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -20.78 dB | -26.27 dB | -20.72 dB |
| X | -22.70 dB | -25.98 dB | -29.81 dB |
| Y | -26.68 dB | -21.27 dB | -28.52 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-09-2021
Tags
DVIA-M Series
Installation Report
YIMO
DVIA-MB3000
201216R1-5
P17
Talos F200
Thermo Fisher
Inner Mongolia University
Related Case Studies

DVIA-M Series
Fuzhou University Thermo Fisher Talos F200 — DVIA-MB3000 (240201R4-1) Installation Report
07-05-2024Read more

DVIA-M Series
YIMO ThermoFisher Talos DVIA-MB3000 (200810R1) Installation Worksheet — 2021.05.12
05-12-2021Read more

DVIA-M Series
YIMO Changshu Tenglong Special Steel Thermo Fisher Scientific Apreo 2C SEM DVIA-M1000 (240501R9) Installation Report
05-11-2026Read more