Skip to main content
Installation Report
DVIA-M Series
04-09-2021

TPK Holding Co., Ltd Thermo Fisher Helios G5 DVIA-MB1000 (201214R4 · P216) Remote measurement — Internal program plots — 2021.04.09

DVIA-M Series
Installation Report
DVIA-MB1000
201214R4
Thermo Fisher Scientific
Helios G5
Xiamen
YIMO

(MB1000_201214R4 (P216) Set up)

Target equipmentTHERMO FISCHER Helios G5
Place of installationXiamen, 4F, TPK Holding
RemarkGood Performance
END USERTPK Holding Co., Ltd
Operator: Doohyun KimDate of setup : 21.04.08
Date of reporting : 21.04.09Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 21.04.08 (Thu)

Operator: Daeil System, Research engineer Doohyun Kim

Place of measurement : Xiamen, 4F, TPK Holding

Equipment Model: THERMO FISCHER Helios G5

Measurement conditions and results

Summary of measurement results

2 Hz5 Hz10 Hz
Z-28 dB-25 dB-32 dB
X-27 dB-30 dB-31 dB
Y-25 dB-24 dB-32 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date04-09-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
201214R4
Thermo Fisher Scientific
Helios G5
Xiamen
YIMO