Installation Report
DVIA-M Series
04-09-2021
TPK Holding Co., Ltd Thermo Fisher Helios G5 DVIA-MB1000 (201214R4 · P216) Remote measurement — Internal program plots — 2021.04.09
DVIA-M Series
Installation Report
DVIA-MB1000
201214R4
Thermo Fisher Scientific
Helios G5
Xiamen
YIMO
Contents
(MB1000_201214R4 (P216) Set up)
| Target equipment | THERMO FISCHER Helios G5 |
|---|---|
| Place of installation | Xiamen, 4F, TPK Holding |
| Remark | Good Performance |
| END USER | TPK Holding Co., Ltd |
| Operator: Doohyun Kim | Date of setup : 21.04.08 |
| Date of reporting : 21.04.09 | Date of business trip : 17.12.27~17.12.29 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.04.08 (Thu)
Operator: Daeil System, Research engineer Doohyun Kim
Place of measurement : Xiamen, 4F, TPK Holding
Equipment Model: THERMO FISCHER Helios G5
Measurement conditions and results
Summary of measurement results
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -28 dB | -25 dB | -32 dB |
| X | -27 dB | -30 dB | -31 dB |
| Y | -25 dB | -24 dB | -32 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-09-2021
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
201214R4
Thermo Fisher Scientific
Helios G5
Xiamen
YIMO
Related Case Studies

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher Hellos 5 UC DVIA-MB1000 (240119R4-1) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher XHR SEM Verios 5 UC DVIA-MB1000 (240119R4-2) Installation Report
05-11-2026Read more