Installation Report
DVIA-M Series
08-07-2020
Helios NanoLab G3Uc DVIA-MB1000 (P142 / 190916R4) Internal program performance — 2020.08.07
DVIA-M Series
Installation Report
DVIA-MB1000
Thermo Fisher Scientific
Helios NanoLab
G3Uc
internal program performance
P142
190916R4
Contents
MB1000 P142 190916R4
| Target equipment | Helios NanoLab G3Uc |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.06 | |
| Date of reporting : 20.08.07 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.06 (Tue),
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement : N/A
Equipment Model: Helios NanoLab G3Uc
Measurement conditions and results
Summary of measurement results
Test Condition
VC-Class
Z
X
Y
Floor
Above Active
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-07-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
Thermo Fisher Scientific
Helios NanoLab
G3Uc
internal program performance
P142
190916R4
Related Case Studies

DVIA-M Series
FEI SEM DVIA-MB1000 Installation Report — MB1000 P142, SN 190916R4 (2020.06.04)
06-04-2020Read more

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Anhui University Thermo Fisher Hellos 5 UC DVIA-MB1000 (240119R4-1) Installation Report
05-11-2026Read more