Installation Report
DVIA-M Series
04-27-2020
YIMO ZEISS Gemini Sigma 300VP DVIA-MB1000 (MB1000 P147) Internal Program — CHINA YIMO_TECH — 2020.04.27
DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini Sigma 300VP
DVIA-MB1000
MB1000
P147
Contents
(MB1000_ P147)
Installation photograph
| Target equipment | ZEISS - Gemini Sigma 300VP |
|---|---|
| Place of installation | 3 FLOOR |
| Remark | Good Performance |
| END USER | - |
| Operator: Choi, Hyoung Mun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.04.27 | Date of reporting : 20.04.27 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2020.04.27 (MON),
Operator: Daeil System, Manager Choi, Hyoung Mun
Place of measurement : N/A
Equipment Model: ZEISS - Gemini Sigma 300VP
Measurement conditions and results
Summary of measurement results
| Test Condition | VC-Class Z | VC-Class X | VC-Class Y |
|---|---|---|---|
| Floor | |||
| Above Active |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date04-27-2020
Tags
DVIA-M Series
Installation Report
YIMO
ZEISS
Gemini Sigma 300VP
DVIA-MB1000
MB1000
P147
Related Case Studies

DVIA-M Series
YIMO ZEISS Gemini Sigma 300VP DVIA-MB1000 (MB1000 P127) Internal Program — CHINA YIMO_TECH — 2020.04.20
04-20-2020Read more

DVIA-M Series
ZEISS Sigma 300 DVIA-MB1000 (210503R7) YIMO internal program — 2022-01-07
01-07-2022Read more

DVIA-M Series
Xi'an Jingke ZEISS GeminiSEM 300 DVIA-MB1000 (210326R6) Installation Report — 2021.11.23
11-23-2021Read more