Installation Report
DVIA-M Series
08-17-2020
YIMO Zeiss G300 DVIA-MB1000 (200319R2 · P164) Remote measurement — Internal program plots — 2020.08.17
DVIA-M Series
Installation Report
DVIA-MB1000
200319R2
P164
Zeiss
CSOT
YIMO
Shenzen
remote tuning
Contents
(MB1000_200319R2(P164) Set up)
| Target equipment | Zeiss G300 |
|---|---|
| Place of installation | Shenzen |
| Remark | Good Performance |
| END USER | TCL华星光电技术有限公司 |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.17 | Date of reporting : 20.08.17 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.17 (MON)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Shenzen
Equipment Model: Zeiss G300
Measurement conditions and results
Summary of measurement results
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -22.05 dB | -25.11 dB | -28.19 dB |
| X | -25.72 dB | -40.11 dB | -27.52 dB |
| Y | -28.21 dB | -37.86 dB | -41.08 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date08-17-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
200319R2
P164
Zeiss
CSOT
YIMO
Shenzen
remote tuning
Related Case Studies

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
11-11-2021Read more

DVIA-M Series
Xiamen Haichen Zeiss Sigma300 DVIA-MB1000 (P239 · 210820R1) Installation Report — 2021.10.12
10-12-2021Read more

DVIA-M Series
Shenzhen Yan Yi New Materials Zeiss Gemini Sigma 300 DVIA-MB1000 (200918R1 · P192) Remote measurement — Internal program plots — 2021.01.11
01-11-2021Read more