설치 보고서
DVIA-M Series
01-22-2021
YIMO Zeiss Crossbeam 550 DVIA-MB1000 (MB1000_P182 / 200720R5-2) Internal Program Performance — 2021.01.22
DVIA-M Series
Installation Report
YIMO
ZEISS Crossbeam 550
DVIA-MB1000
MB1000_P182
200720R5-2
목차
MB1000 P182 YIMO 200720R5-2
| Target equipment | ZEISS-Crossbeam550 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.01.21 | |
| Date of reporting : 21.01.22 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.01.21 (THU)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: ZEISS-Crossbeam550
측정 조건 및 결과
측정 결과 요약
| 축 | Transmissibility (2 Hz) | Transmissibility (5 Hz) | Transmissibility (10 Hz) |
|---|---|---|---|
| Z | -21 dB | -28 dB | -33 dB |
| X | -24 dB | -33 dB | -33 dB |
| Y | -24 dB | -33 dB | -33 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일01-22-2021
태그
DVIA-M Series
Installation Report
YIMO
ZEISS Crossbeam 550
DVIA-MB1000
MB1000_P182
200720R5-2
관련 케이스 스터디

DVIA-M Series
YIMO Nexchip ZEISS Crossbeam 550 DVIA-MB1000 (MB1000 P212 · 210204R3) Internal Program — 2021.06.29
06-29-2021자세히

DVIA-M Series
YIMO Ningde era Thermo Fisher Apreo 2S DVIA-MB1000 (240103R5) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026자세히