YIMO Zeiss G300 DVIA-MB1000(200319R2 · P164) 원격 성능평가 — 내부 프로그램 플롯 — 2020.08.17
DVIA-M Series
Installation Report
DVIA-MB1000
200319R2
P164
Zeiss
CSOT
YIMO
Shenzen
remote tuning
목차
(MB1000_200319R2(P164) Set up)
| Target equipment | Zeiss G300 |
|---|---|
| Place of installation | Shenzen |
| Remark | Good Performance |
| END USER | TCL华星光电技术有限公司 |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.08.17 | Date of reporting : 20.08.17 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.08.17 (MON)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Shenzen
Equipment Model: Zeiss G300
측정 조건 및 결과
측정 결과 요약
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -22.05 dB | -25.11 dB | -28.19 dB |
| X | -25.72 dB | -40.11 dB | -27.52 dB |
| Y | -28.21 dB | -37.86 dB | -41.08 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일08-17-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
200319R2
P164
Zeiss
CSOT
YIMO
Shenzen
remote tuning
관련 케이스 스터디

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000(210903R3) 내부 프로그램 성능 측정 — 2021.11.11
11-11-2021자세히

DVIA-M Series
厦门海辰 Zeiss Sigma300 DVIA-MB1000(P239 · 210820R1) 설치 보고서 — 2021.10.12
10-12-2021자세히

DVIA-M Series
선전(深圳) 연일신재료 Zeiss Gemini Sigma300 DVIA-MB1000(200918R1 · P192) 원격 성능평가 — 내부 프로그램 플롯 — 2021.01.11
01-11-2021자세히