YIMO Zeiss EVO10 DVIA-MB1000(210903R3) 내부 프로그램 성능 측정 — 2021.11.11
DVIA-M Series
Installation Report
YIMO
Zeiss
EVO10
DVIA-MB1000
210903R3
목차
MB1000 P252 210903R3
| Target equipment | Zeiss-EVO10 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.11.10 | |
| Date of reporting : 21.11.11 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.11.10 (WED)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: Zeiss-EVO10
Measurement conditions and results
Summary of measurement results
| Test Condition | Transmissibility | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|---|
| Z | -35 dB | -25 dB | -30 dB | |
| X | -35 dB | -30 dB | -30 dB | |
| Y | -35 dB | -28 dB | -25 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일11-11-2021
태그
DVIA-M Series
Installation Report
YIMO
Zeiss
EVO10
DVIA-MB1000
210903R3
관련 케이스 스터디

DVIA-M Series
宝钢 연구개발 센터 ZEISS EVO10 DVIA-MB1000(200522R2-1 · P166) 내부 프로그램 성과지 — 2020.12.15
12-15-2020자세히

DVIA-M Series
厦门海辰 Zeiss Sigma300 DVIA-MB1000(P239 · 210820R1) 설치 보고서 — 2021.10.12
10-12-2021자세히

DVIA-M Series
선전(深圳) 연일신재료 Zeiss Gemini Sigma300 DVIA-MB1000(200918R1 · P192) 원격 성능평가 — 내부 프로그램 플롯 — 2021.01.11
01-11-2021자세히