Installation Report
DVIA-P Series
04-29-2022
DVIA-UB700 Required Tools (Field Handout)
DVIA-P Series
DVIA-UB700
Required Tools
Installation support
Field handout
Contents
DVIA-UB700 Required tools
| Number | Sequence of the work | Tool |
|---|---|---|
| 1 | Use a 3mm hex key to remove all the covers. | 3 mm Hex Key |
| 2 | Use an 8 mm hex key to remove four transportation locking brackets. | 6 mm Hex Key |
| 3 | Adjust the metal springs with a 6 mm hex key until the upperpart is 2/3 of the stopper. | 6 mm Hex Key |
1. Use a 3 mm hex key to remove all the covers.
2. Use an 8 mm hex key to remove four transportation locking brackets.
3. Adjust the metal springs with a 6 mm hex key until the upperpart is 2/3 of the stopper.
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-P Series
Date04-29-2022
Tags
DVIA-P Series
DVIA-UB700
Required Tools
Installation support
Field handout
Related Case Studies
DVIA-P Series
Tier-1 Semiconductor Texas Advantest E5620 DVIA-P4000 Installation Report
08-14-2026Read more
DVIA-P Series
Tier-1 Semiconductor Giheung Bruker AFM NM-VI6 DVIA-P4000 Installation Report (VOC26-132)
08-03-2026Read more

DVIA-P Series
Tier-1 Electronics Component Manufacturer BGA-PSP DVIA-P2200 Installation Report
07-24-2026Read more