Skip to main content
Installation Report
DVIA-M Series
11-06-2024

Thermo Fisher Spectra 300 S/TEM DVIA-STONE-300 — Shenzhen Weiguang, 2024-11-05

DVIA-M Series
Installation Report
Shenzhen Weiguang
Thermo Fisher Scientific
Spectra 300
S/TEM
DVIA-STONE-300
STONE-300 internal program
240415R3-2
Shenzhen

Shenzhen Weiguang

(STONE-300_ 240413R3-2 Set up)

Facility photograph

Target equipmentThermo Fisher Spectra 300
Place of installationShenzhen, China
RemarkGood Performance
END USERShenzhen Weiguang
Operator: Chaewon Lee Date of setup: 24.11.05 Date of reporting: 24.11.06Date of business trip : 17.12.27~17.12.29
Overview The DVIA-STONE-300 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2024.11.05 (Tuesday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: Shenzhen, China Equipment Model: Manufacturer: Thermo Fisher Scientific Equipment: S/TEM Model: Spectra 3005.

STONE-300 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date11-06-2024
Tags
DVIA-M Series
Installation Report
Shenzhen Weiguang
Thermo Fisher Scientific
Spectra 300
S/TEM
DVIA-STONE-300
STONE-300 internal program
240415R3-2
Shenzhen