(M1000_ 231228R1 Set up)

Site checklist

Target equipmentThermo Fisher Helios PFIB
Place of installation海南
RemarkGood Performance
END USER海南大学

Operator and dates

Operator: Lee, Youngha

Date of setup: 24.01.30

Date of reporting: 24.02.01

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.01.30 (Tuesday)

Operator: DAEIL SYSTEMS Youngha Lee

Place of measurement: 海南

Equipment Model: Thermo Fisher Quattro S

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date01-30-2024
Tags
DVIA-M Series
Installation Report
Hainan University
Thermo Fisher
Helios PFIB
Quattro S
DVIA-M1000
231228R1
海南