Installation Report
DVIA-M Series
07-20-2024
Shanghai Institute of Ceramics CAS — Thermo Fisher Spectra 300 TEM DVIA-STONE-300 (231113R4-1) Internal Program Report
DVIA-M Series
Installation Report
DVIA-STONE-300
Thermo Fisher Scientific
Spectra 300
231113R4-1
Shanghai Institute of Ceramics
Chinese Academy of Sciences
STONE-300 internal program
Contents
Shanghai Institute of Ceramics,
Chinese Academy of Sciences Analysis & Testing Research Center
(STONE-300_ 231113R4-1 Set up)
| Target equipment | Thermo Fisher Spectra 300 |
|---|---|
| Place of installation | 上海 |
| Remark | Good Performance |
| END USER | 硅酸盐研究院-分析检测研究中心 |
Operator: Chaewon Lee
Date of setup: 24.07.19
Date of reporting: 24.07.20
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-STONE-300 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.07.19 (Friday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: 上海
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: TEM
Model: Spectra 300
5.
STONE-300 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-20-2024
Tags
DVIA-M Series
Installation Report
DVIA-STONE-300
Thermo Fisher Scientific
Spectra 300
231113R4-1
Shanghai Institute of Ceramics
Chinese Academy of Sciences
STONE-300 internal program
Related Case Studies

DVIA-M Series
Peking University Huairou Thermo Fisher Spectra 300 TEM DVIA-STONE-300 (210824R1-1) — Internal Program (measurement 2025.03.27)
03-27-2025Read more

DVIA-M Series
DVIA-STONE-300 (240513R3) Thermo Fisher Spectra 300 — Internal Program (measurement 2024.11.13)
11-13-2024Read more

DVIA-M Series
Thermo Fisher Spectra 300 S/TEM DVIA-STONE-300 — Shenzhen Weiguang, 2024-11-05
11-06-2024Read more