Skip to main content
Installation Report
DVIA-M Series
03-25-2024

Hainan University Thermo Fisher Spectra 300 DVIA-M-JT1 (230918R3) Internal Program Performance — 2024.03.25

DVIA-M Series
Installation Report
Hainan University
Thermo Fisher
Spectra 300
DVIA-M-JT1
230918R3
海南

BCPCA

(M-JT1_ 230918R3 Set up)

Equipment picture

Hainan University

海南大学

Target equipmentThermo Fisher Spectra 300
Place of installation海南
RemarkGood Performance
END USER海南大学
Operator: Lee, ChaewonDate of business trip : 17.12.27~17.12.29
Date of setup: 24.03.25
Date of reporting: 24.07.05

Overview

The DVIA-M-JT1 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.03.25 (Monday)

Operator

Operator: DAEIL SYSTEMS Chaewon Lee

Place of measurement

Beijing

Equipment Model

JEOL JEM-F200

5.

M-JT1 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date03-25-2024
Tags
DVIA-M Series
Installation Report
Hainan University
Thermo Fisher
Spectra 300
DVIA-M-JT1
230918R3
海南