Installation Report
DVIA-M Series
07-05-2024
Southern University of Science and Technology ZEISS FIB-SEM Crossbeam350 DVIA-M1000 (230525R9) internal program
DVIA-M Series
Installation Report
Southern University of Science and Technology
SUSTech
ZEISS
Crossbeam350
FIB-SEM
DVIA-M1000
230525R9
Contents
Target equipment
ZEISS Crossbeam350
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Chaewon Lee
Date of setup: 24.03.28
Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2024.03.28(Thursday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement
Southern University of Science and Technology-
Equipment Model
N/A
Manufacturer
ZEISS
Equipment
FIB-SEM
Model
Crossbeam350
5.
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
Southern University of Science and Technology
SUSTech
ZEISS
Crossbeam350
FIB-SEM
DVIA-M1000
230525R9
Related Case Studies

DVIA-M Series
YIMO ZEISS FIB-SEM Crossbeam350 DVIA-M1000 (241011R4) Installation Report
03-12-2025Read more

DVIA-M Series
YIMO ZEISS FIB-SEM Crossbeam350 DVIA-M1000 (241224R6) Installation Report
02-18-2025Read more

DVIA-M Series
YIMO Nanjing Huatian Technology ZEISS FIB-SEM Crossbeam350 DVIA-M1000 (240826R3) Installation Report
02-17-2025Read more