Installation Report
DVIA-M Series
06-14-2023
Hatchip ZEISS FIB-SEM Crossbeam 350 DVIA-M1000 (221109R2) Installation Report
DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen
Contents
(M1000_ 221109R2 Set up)
Site checklist
| Target equipment | Crossbeam 350 |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | Hatchip Co., Ltd. |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 23.06.14
Date of reporting: 23.06.19
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.14 (Wednesday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Shenzhen
Equipment Model: Crossbeam 350
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-14-2023
Tags
DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen
Related Case Studies

DVIA-M Series
YIMO Southern University of Science and Technology ZEISS Crossbeam 350 FIB-SEM DVIA-M1000 (240401R1-1) Installation Report
07-05-2024Read more

DVIA-M Series
ZEISS Crossbeam 350 FIB-SEM DVIA-M1000 (231219R4) Installation Report
11-08-2024Read more

DVIA-M Series
ZEISS FIB-SEM Crossbeam 350 DVIA-M1000 (250102R2-3) Installation Report
03-25-2025Read more