Skip to main content
Installation Report
DVIA-M Series
06-14-2023

Hatchip ZEISS FIB-SEM Crossbeam 350 DVIA-M1000 (221109R2) Installation Report

DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen

(M1000_ 221109R2 Set up)

Site checklist

Target equipmentCrossbeam 350
Place of installationShenzhen
RemarkGood Performance
END USERHatchip Co., Ltd.

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.06.14

Date of reporting: 23.06.19

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.06.14 (Wednesday)

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Shenzhen

Equipment Model: Crossbeam 350

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-14-2023
Tags
DVIA-M Series
Installation Report
Hatchip
ZEISS
Crossbeam 350
FIB-SEM
DVIA-M1000
221109R2
Shenzhen