Skip to main content
Installation Report
DVIA-ULF Series
05-10-2023

BAOWU ALUMINUM TECHNOLOGY CO.,LTD. EVO10 DVIA-U1000 (221012R10) Installation Report — Henan

DVIA-U Series
Installation Report
BAOWU ALUMINUM TECHNOLOGY
EVO10
Henan
DVIA-U1000
221012R10

BAOWU ALUMINUM TECHNOLOGY CO.,LTD.

BAOWU ALUMINUM TECHNOLOGY CO.,LTD.

(U1000_ 221012R10 Set up)

Site checklist

Target equipmentEVO10
Place of installationHENAN
RemarkGood Performance
END USERBAOWU ALUMINUM TECHNOLOGY CO.,LTD.

Operator and dates

Operator: Lee, Youngha Date of setup: 23.04.17 Date of reporting: 23.05.10Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.04.17 (Monday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: HENAN, China

Equipment Model: EVO10

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date05-10-2023
Tags
DVIA-U Series
Installation Report
BAOWU ALUMINUM TECHNOLOGY
EVO10
Henan
DVIA-U1000
221012R10