Installation Report
DVIA-M Series
07-05-2024
Sun Yat-sen University JEOL EA1400 TEM DVIA-M-JT2 (220126R7-4) Internal Program Performance — 2024.07.05
DVIA-M Series
Installation Report
Sun Yat-sen University
JEOL
EA1400
GUANGDONG
DVIA-M-JT2
220126R7-4
Contents
SUN YAT-SEN UNIVERSITY
(M-JT2_ 221026R7-4 Set-up)
Site checklist
| Target equipment | JEOL EA1400 |
|---|---|
| Place of installation | GUANGDONG |
| Remark | Good Performance |
| END USER | SUN YAT-SEN UNIVERSITY |
Operator and dates
Operator: Chaewon Lee Date of setup: 24.04.11 Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
Overview
Overview The DVIA-M-JT2 active vibration isolation platform is appropriately installed and functioning as intended. Tuning was conducted focus on stability. Measurement date: 2024.04.11(Thursday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: GUANGDONG Equipment Model: Manufacturer: JEOL Equipment: TEM Model: EA1400
5.
M-JT2 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
Sun Yat-sen University
JEOL
EA1400
GUANGDONG
DVIA-M-JT2
220126R7-4
Related Case Studies

DVIA-M Series
Sun Yat-sen University EA1400 DVIA-M-JT2 (220126R7-3) Installation Report
05-22-2023Read more

DVIA-M Series
POSCO Global R&D Center JEOL JSM-7001F DVIA-MB1000 (230518R2) Installation Report
05-15-2026Read more

DVIA-M Series
Safran JEOL JSM-IT800 DVIA-ML1000 Installation Report
12-17-2025Read more