Skip to main content
Installation Report
DVIA-ML Series
04-17-2023

Zhonghuan Advanced Semiconductor Materials Cameca IMS-6f-E7 DVIA-M3000 (210506R1) Installation Report

DVIA-ML Series
Installation Report
Zhonghuan Advanced Semiconductor Materials
Cameca
IMS-6f-E7
YIXING
DVIA-M3000
210506R1

Zhonghuan Advanced Semiconductor Materials Co., Ltd.

(M3000_ 210506R1 Set up)

Site checklist

Target equipmentcameca_ims-6f-e7
Place of installationYIXING
RemarkGood Performance
END USERZhonghuan Advanced Semiconductor Materials Co., Ltd.

Operator and dates

Operator: Lee, Young Ha Date of setup: 23.04.17 Date of reporting: 23.04.17

Date of business trip : 17.12.27~17.12.29

Overview

Overview The DVIA-M3000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.04.17 (Monday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: YIXING Equipment Model: cameca_ims-6f-e7

MB3000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ML Series
Date04-17-2023
Tags
DVIA-ML Series
Installation Report
Zhonghuan Advanced Semiconductor Materials
Cameca
IMS-6f-E7
YIXING
DVIA-M3000
210506R1