Installation Report
DVIA-P Series
05-26-2026
Guangzhou Bio Island Thermoscientific Axia UB700 P3 (181107R4-2) Installation Report
DVIA-P Series
Installation Report
Guangzhou Bio Island
Thermoscientific
Axia
UB700
181107R4-2
Transmissibility
internal program
Contents
Worksheet
UB700 P3(181107R4-2)
Target equipment
Thermoscientific Axia
Place of installation
guangzhou
Remark
Good Performance
End User
广州生物岛
Operator · setup · reporting
Operator: Kim, Doohyun
Date of setup
21.10.25
Date of reporting
21.10.25
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.10.25 (MON)
Measurement operator
Operator: Daeil System, Research engineer Kim, Doohyun
Place of measurement
Place of measurement : guangzhou, 广州生物岛
Equipment Model
Thermoscientific Axia
Measurement conditions and results
Summary of measurement results
| Test Condition | 2 Hz | 3 Hz | 10 Hz |
|---|---|---|---|
| Z | -3.5 dB | -10 dB | -28.2 dB |
| X | -3.5 dB | -10 dB | -25.8 dB |
| Y | -3.7 dB | -10 dB | -25.9 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-P Series
Date05-26-2026
Tags
DVIA-P Series
Installation Report
Guangzhou Bio Island
Thermoscientific
Axia
UB700
181107R4-2
Transmissibility
internal program


