설치 보고서
DVIA-M Series
08-29-2023

Jingmen 605 Sigma 300 DVIA-M1000 (230627R4) Installation Report

DVIA-M Series
Installation Report
Jingmen
Jingmen 605
DVIA-M1000
230627R4
Sigma 300

Jingmen 605

Jingmen 605

(M1000_ 230627R4 Set up)

현장 확인 항목

Target equipmentSigma 300
Place of installationJingmen
RemarkGood Performance
END USERJingmen 605

운영자 및 일정

Operator: Lee, Youngha

Date of setup: 23.08.29

Date of reporting: 23.08.29

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.08.29 (Tuesday)

Operator: DAEIL SYSTEMS Youngha Lee

Place of measurement: Jingmen

Equipment Model: Sigma 300

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis