설치 보고서
DVIA-M Series
06-19-2023
Ningbo University Equipment Model G360 DVIA-M1000 Internal Program Report
DVIA-M Series
Installation Report
Ningbo University
G360
DVIA-M1000
230426R2
Contents
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.16 (Friday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: NINGBO
Equipment Model: G360
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일06-19-2023
태그
DVIA-M Series
Installation Report
Ningbo University
G360
DVIA-M1000
230426R2
관련 케이스 스터디

DVIA-M Series
YIMOTECH Thermo Fisher Scientific Helios 5CX FIB-SEM DVIA-M1000 Installation Report
07-02-2026자세히

DVIA-M Series
Zhongju Core Quzhou Technology Hitachi High-Tech SU-8600 SEM DVIA-M1000 Installation Report
07-01-2026자세히

DVIA-M Series
RIGOL TECHNOLOGIES Sigma300 DVIA-M1000 (220907R4-1) Installation Report
05-16-2026자세히