설치 보고서
DVIA-M Series
11-29-2022
Hitachi SU8600 SEM DVIA-M1000 Internal Program Performance Report — ZEEKR (Shenzhen, 2022)
DVIA-M Series
Installation Report
DVIA-M1000
Hitachi
SU8600
SEM
ZEEKR
Shenzhen
ZEEKR
(M1000_ 220630R2 Set up)
설치 상태(장비 사진)
| Target equipment | SU8600 |
|---|---|
| Place of installation | SHENZHEN |
| Remark | Good Performance |
| END USER | ZEEKR |
Operator: Yu, Ho Sang Date of setup: 22.11.28 Date of reporting: 22.11.29
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2022.11.28 (Monday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: SHENZHEN Equipment Model: SU8600
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일11-29-2022
태그
DVIA-M Series
Installation Report
DVIA-M1000
Hitachi
SU8600
SEM
ZEEKR
Shenzhen
관련 케이스 스터디

DVIA-M Series
Suzhou Xiangcheng Enterprise Technology Hitachi SU8600 FE-SEM DVIA-M1000 (240304R7) Installation Report
05-11-2026자세히

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026자세히

DVIA-M Series
Hitachi SEM SU8230 DVIA-M1000 (250421R6) Installation Report
03-26-2026자세히