설치 보고서
DVIA-M Series
05-27-2022
Wenzhou Hongfeng ZEISS Sigma 300 Haimen DVIA-M1000 Installation Report (220216R1, 2022-05-27)
DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300
Contents
Wenzhou Hongfeng Electrical Alloy Co., Ltd.
(M1000_ 220216R1 Set up)
현장 확인 항목
| Target equipment | ZEISS Sigma300 |
|---|---|
| Place of installation | Haimen |
| Remark | Good Performance |
| END USER | General Lithium Corporation |
운영자 및 일정
Operator: Cheon, Seoung hoon
Date of setup: 22.05.27
Date of reporting: 22.05.27
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.05.27 (Friday),
Operator: DAEIL SYSTEMS, Seounghoon Cheon
Place of measurement: Haimen
Equipment Model: ZEISS Sigma300
측정 조건 및 결과
측정 결과 요약
| Z | X | Y | |
|---|---|---|---|
| Floor | B | C | D |
| Above Active | F | F | F |
Good omnidirectional performance.
MB1000 internal program performance measurement result
MB1000 internal program — Z axis
MB1000 internal program — X axis
MB1000 internal program — Y axis
Octave Band Result
Octave Band Result — Z axis
Octave Band Result — X axis
Octave Band Result — Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-27-2022
태그
DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300


