본문으로 바로가기
설치 보고서
DVIA-M Series
05-27-2022

Wenzhou Hongfeng ZEISS Sigma 300 Haimen DVIA-M1000 Installation Report (220216R1, 2022-05-27)

DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300

Wenzhou Hongfeng Electrical Alloy Co., Ltd.

(M1000_ 220216R1 Set up)

현장 확인 항목

Target equipmentZEISS Sigma300
Place of installationHaimen
RemarkGood Performance
END USERGeneral Lithium Corporation

운영자 및 일정

Operator: Cheon, Seoung hoon

Date of setup: 22.05.27

Date of reporting: 22.05.27

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.05.27 (Friday),

Operator: DAEIL SYSTEMS, Seounghoon Cheon

Place of measurement: Haimen

Equipment Model: ZEISS Sigma300

측정 조건 및 결과

측정 결과 요약

ZXY
FloorBCD
Above ActiveFFF

Good omnidirectional performance.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Octave Band Result

Octave Band Result — Z axis

Octave Band Result — X axis

Octave Band Result — Y axis

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일05-27-2022
태그
DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300