설치 보고서
DVIA-M Series
12-13-2021
YIMO Hitachi SU8100 MB1000 P261 (211013R1) internal program handout — 2021.12.13
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211013R1
P261
Hitachi
SU8100
목차
(MB1000 P261 211013R1 Set up)
Target equipment
HITACH SU8100
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Choi , HyoungMun
Date of setup
Date of setup : 21.11.30
Date of reporting
Date of reporting : 21.12.13
Date of business trip
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
측정 일자
Measurement date: 21.11.30 (thu)
Operator: Daeil System, Research engineer Choi, HyoungMun
측정 장소
Place of measurement : N/A
Equipment Model
Equipment Model: HITACH SU8100
측정 조건 및 결과
측정 결과 요약
| 테스트 조건 | 2 Hz | 5 Hz | 10 Hz | ||
|---|---|---|---|---|---|
| Z | -32 dB | -25 dB | -25 dB | ||
| X | -37 dB | -35 dB | -35 dB | ||
| Y | -31 dB | -30 dB | -28 dB | ||
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-13-2021
태그
DVIA-M Series
Installation Report
YIMO
DVIA-MB1000
211013R1
P261
Hitachi
SU8100
관련 케이스 스터디

DVIA-M Series
YIMO remote tuning — Inner Mongolia Univ. Hitachi SU8100 DVIA-MB1000 (201216R1-2 · P211) — 2021.06.10
06-10-2021자세히

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Hitachi SU8600 FE-SEM DVIA-MB1000 (250515R3) Installation Report
11-17-2025자세히