설치 보고서
DVIA-M Series
09-05-2022
Guangdong Technion-Israel Institute of Technology Raith Pioneer two EBL DVIA-M1000 (210423R1) — 2022.09.05
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1
목차
(M1000_ 210423R1 Set up)
설치 현장
| Target equipment | Raith Pioneer two EBL |
|---|---|
| Place of installation | Shantou |
| Remark | Good Performance |
| END USER | Guangdong Technion-Israel Institute of Technology |
| Operator: Yu, Ho Sang | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 22.09.05 | |
| Date of reporting: 22.09.13 |
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.09.05 (Monday),
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: Shantou
Equipment Model: Raith Pioneer two EBL
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-05-2022
태그
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1
관련 케이스 스터디

DVIA-M Series
YIMOTECH Thermo Fisher Scientific Helios 5CX FIB-SEM DVIA-M1000 Installation Report
07-02-2026자세히

DVIA-M Series
Zhongju Core Quzhou Technology Hitachi High-Tech SU-8600 SEM DVIA-M1000 Installation Report
07-01-2026자세히

DVIA-M Series
RIGOL TECHNOLOGIES Sigma300 DVIA-M1000 (220907R4-1) Installation Report
05-16-2026자세히