본문으로 바로가기
설치 보고서
DVIA-M Series
09-05-2022

Guangdong Technion-Israel Institute of Technology Raith Pioneer two EBL DVIA-M1000 (210423R1) — 2022.09.05

DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1

(M1000_ 210423R1 Set up)

설치 현장

Target equipmentRaith Pioneer two EBL
Place of installationShantou
RemarkGood Performance
END USERGuangdong Technion-Israel Institute of Technology
Operator: Yu, Ho SangDate of business trip : 17.12.27~17.12.29
Date of setup: 22.09.05
Date of reporting: 22.09.13

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.09.05 (Monday),

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: Shantou

Equipment Model: Raith Pioneer two EBL

MB1000 internal program performance measurement result

Z축

X축

Y축

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-05-2022
태그
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1