설치 보고서
DVIA-M Series
01-19-2021
YIMO ZEISS Crossbeam 550 DVIA-MB1000 (P204 / 201013R2) Internal program performance — 2021.01.19
DVIA-M Series
Installation Report
DVIA-MB1000
ZEISS
Crossbeam 550
YIMO
internal program performance
P204
201013R2
목차
MB1000 P204 (201013R2)
| Target equipment | ZEISS-Crossbeam550 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.01.18 | |
| Date of reporting : 21.01.19 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 21.01.18 (Mon)
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement : N/A
Equipment Model: ZEISS-Crossbeam550
측정 조건 및 결과
측정 결과 요약
Test Condition
Transmissibility
| 방향 | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -26 dB | -38 dB | -35 dB |
| X | -26 dB | -38 dB | -33 dB |
| Y | -26 dB | -35 dB | -33 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일01-19-2021
태그
DVIA-M Series
Installation Report
DVIA-MB1000
ZEISS
Crossbeam 550
YIMO
internal program performance
P204
201013R2
관련 케이스 스터디

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021자세히

DVIA-M Series
ZEISS Crossbeam 550 DVIA-MB1000 P228 (210510R5) Internal Program Performance — YIMO — 2021.10.28
10-28-2021자세히

DVIA-M Series
Shagang Group ZEISS Crossbeam 550 DVIA-MB1000 (201028R1 · P202, YIMO remote tuning) — 2021.04.12
04-12-2021자세히