목차
MO1000_200729R1(P191) Set up
| 설치 장비(Target equipment) | Concentric distance measuring equipment |
|---|---|
| 설치 위치 | kunshan 1 floor |
| 비고(Remark) | Good Performance |
| END USER | 昆山集萃精凯 |
Operator: Munho Noh
Date of setup : 20.09.22
Date of reporting : 20.09.22
Date of business trip : 17.12.27~17.12.29
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.09.22 (TUE)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : kunshan 1 floor
Equipment Model: Concentric distance measuring equipment
측정 조건 및 결과
측정 결과 요약
Good omnidirectional performance.
| Test Condition | Transmissibility | |
|---|---|---|
| 2 Hz | 5 Hz | |
| Z | -31.23 dB | -31.99 dB |
| X | -26.38 dB | -26.42 dB |
| Y | -27.23 dB | -25.66 dB |
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-22-2020
태그
DVIA-M Series
Installation Report
Wangbo
Kunshan
DVIA-MO1000
P191
remote tuning
MO1000 internal program