설치 보고서
DVIA-M Series
12-02-2020
Zili Co., Ltd. Zeiss Sigma 500 DVIA-MB1000 (200715R3-2 · P187) Remote measurement — Internal program plots — 2020.12.02
DVIA-M Series
Installation Report
DVIA-MB1000
200715R3-2
Zeiss
Sigma 500
Shaoxing
YIMO
P187
목차
(MB1000_200715R3-2(P187) Set up)
| Target equipment | zeiss sigma500 |
|---|---|
| Place of installation | shaoxing |
| Remark | Good Performance |
| END USER | 自立股份 |
| Operator: Munho Noh | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.12.02 | Date of reporting : 20.12.04 |
개요
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.12.02 (WED)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement : Shaoxing
Equipment Model: zeiss sigma 500
측정 조건 및 결과
측정 결과 요약
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -22.88 dB | -10.88 dB | -32.55 dB |
| X | -25.72 dB | -26.13 dB | -33.58 dB |
| Y | -31.06 dB | -25.85 dB | -51.72 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-02-2020
태그
DVIA-M Series
Installation Report
DVIA-MB1000
200715R3-2
Zeiss
Sigma 500
Shaoxing
YIMO
P187
관련 케이스 스터디

DVIA-M Series
Zhejiang Zili Co., Ltd. Zeiss Sigma 500 DVIA-MB1000 (200715R3-1 · P186) Remote measurement — Internal program plots — 2020.08.19
08-19-2020자세히

DVIA-M Series
Suzhou Weixin Electronics Zeiss Sigma 500 DVIA-MB1000 (190109R5 · P109) Remote tuning — Internal program plots — 2020.08.20
08-20-2020자세히

DVIA-M Series
YIMO Zeiss EVO10 DVIA-MB1000 (210903R3) Internal Program Performance — 2021.11.11
11-11-2021자세히