설치 보고서
DVIA-M Series
12-30-2019
SYE Hitachi SU3500 DVIA-MB1000 (MB1000_P135 / 190816R1) Installation Report
DVIA-M Series
Installation Report
SYE
Hitachi
SU3500
DVIA-MB1000
MB1000_P135
190816R1
목차
설치 현장 사진
개요
| Target equipment | HITACHI-SU3500 |
|---|---|
| Place of installation | F1, SYE |
| Remark | Good Performance |
| END USER | SYE |
Operator: Choi, Hyoung Mun
Date of setup : 19.12.27
Date of reporting : 19.12.30
Date of business trip : 17.12.27~17.12.29
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 2019.12.27 (Fri),
Operator: Daeil System, Manager Choi, Hyoung Mun
Place of measurement : F1, SYE
Equipment Model: HITACHI-SU3500
측정 조건 및 결과
측정 결과 요약
| 시험 조건 | Z | X | Y |
|---|---|---|---|
| Floor | N/A | N/A | N/A |
| Above Active | N/A | N/A | N/A |
Good omnidirectional performance.
MB1000 내부 프로그램 성능 측정 결과
내부 프로그램 Z축
내부 프로그램 X축
내부 프로그램 Y축
Octave Band Result (BASE: Floor, TOP: Above Active)
옥타브 밴드 Z축
옥타브 밴드 X축
옥타브 밴드 Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-30-2019
태그
DVIA-M Series
Installation Report
SYE
Hitachi
SU3500
DVIA-MB1000
MB1000_P135
190816R1
관련 케이스 스터디

DVIA-M Series
Hitachi SEM SU3500 DVIA-MB1000 (MB1000 P12) China business trip worksheet — 2016.04.08
04-08-2016자세히

DVIA-M Series
YIMO Allide (Shanghai) Hitachi SU8600 FE-SEM DVIA-MB1000 (240103R6) Installation Report
05-11-2026자세히

DVIA-M Series
YIMO Hitachi SU8600 FE-SEM DVIA-MB1000 (250515R3) Installation Report
11-17-2025자세히