본문으로 바로가기
설치 보고서
DVIA-M Series
03-08-2018

FATRI-UTC ZEISS-Gemimi DVIA-MB1000 (P55) Installation Report — 2018.03.08

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P55
FATRI-UTC
ZEISS
Quanzhou

FATRI-UTC In Quanzhou

(MB1000_P55 Set up)

Target equipment photo

Target equipmentZEISS-Gemimi
Place of installation1st Floor, FATRI-UTC, Quanzhou
UniquenessGood performance
END USERFATRI-UTC
Business traveler: Choi, HyoungMunDate of business trip : 18.03.05~18.03.07
Date Created : 18.03.08

개요

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

측정 일자

Measurement date: 2018.03.06 (Tuesday), Rater: Daeil System, Manager Choi , Hyoung Moon

측정 장소

Place of measurement : 1st Floor, FATRI-UTC, Quanzhou (Analytical Clean Room)

Equipment Model

Equipment Model: ZEISS-Gemimi

측정 조건 및 결과

N/A

측정 결과 요약

Test ConditionVC-Class ZVC-Class XVC-Class Y
FloorFFF
Above ActiveGGG

Good omnidirectional performance and attached VC-Class graph.

MB1000 internal program performance measurement result

Z axis - internal program

X axis - internal program

Y axis - internal program

Octave Band Result (BASE: Floor, TOP: Above Active)

Z axis - octave band result

X axis - octave band result

Y axis - octave band result

이 케이스 스터디 공유하기

케이스 스터디 정보

카테고리
설치 보고서
시리즈DVIA-M Series
작성일03-08-2018
태그
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P55
FATRI-UTC
ZEISS
Quanzhou