Installation Report
DVIA-M Series
09-09-2024

ZEISS Crossbeam350 FIB-SEM DVIA-M1000 (231128R3) — Tier-1 Semiconductor installation worksheet

DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam350
FIB-SEM
DVIA-M1000
DVIA-ML1000
231128R3

Tier-1 Semiconductor

Tier-1 Semiconductor

(M1000_ 231128R3 Set-up)

Site checklist

Target equipmentZEISS Crossbeam350
Place of installationN/A
RemarkGood Performance
END USERN/A

Operator and dates

Operator: Chaewon Lee

Date of setup: 24.08.28

Date of reporting: 24.09.09

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.08.28(Wednesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model: N/A

Manufacturer: ZEISS

Equipment: FIB-SEM

Model: Crossbeam350

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-09-2024
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
ZEISS
Crossbeam350
FIB-SEM
DVIA-M1000
DVIA-ML1000
231128R3