Installation Report
DVIA-M Series
02-04-2024

Tier-1 Semiconductor DVIA-M-THT3 (230818R1-2) internal program worksheet — setup 2024.02.04

DVIA-M Series
Installation Report
Tier-1 Semiconductor
DVIA-M-THT3
230818R1-2

Worksheet

M-THT3_ 230818R1-2 Set-up

Target equipment: N/A

Place of installation: N/A

Remark: Good Performance

END USER: N/A

Operator · setup · reporting

Operator: Chaewon Lee Date of setup: 24.02.04 Date of reporting: 24.07.05

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M-THT3 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.02.04(Sunday)

Operator

Chaewon Lee from DAEIL SYSTEMS

Place of measurement

N/A

Equipment Model

N/A

M-THT3 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date02-04-2024
Tags
DVIA-M Series
Installation Report
Tier-1 Semiconductor
DVIA-M-THT3
230818R1-2