Installation Report
DVIA-ULF Series
03-10-2023

FUJIAN ZI JIN TONG BO Axia ChemiSEM LoVac DVIA-U1000 (220718R11) Installation Report

DVIA-ULF Series
Installation Report
FUJIAN ZI JIN TONG BO
Axia ChemiSEM
DVIA-U1000
220718R11
China

End User

Target equipmentAxia ChemiSEM LoVac
Place of installationFUJIAN
RemarkGood Performance
END USERFUJIAN ZI JIN TONG BO

Operator

Operator: Lee, Youngha Date of setup: 23.03.07 Date of reporting: 23.03.10Date of business trip : 17.12.27~17.12.29

Overview

Overview The DVIA-U1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.03.07 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: FUJIAN, China Equipment Model: Axia ChemiSEM LoVac

(U1000_ 220718R11 Set up)

U1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-ULF Series
Date03-10-2023
Tags
DVIA-ULF Series
Installation Report
FUJIAN ZI JIN TONG BO
Axia ChemiSEM
DVIA-U1000
220718R11
China