설치 보고서
DVIA-ULF Series
03-26-2025
Space-X Thermo Fisher Scientific FIB-SEM Quattro DVIA-U1000 (241204R5) Installation Report — Hawthorne, California
DVIA-U Series
Installation Report
Space-X
Thermo Fisher Scientific
Quattro
FIB-SEM
Hawthorne
California
DVIA-U1000
241204R5
목차
Space-X
Space-X
(U1000_ 241204R5 Set up)
현장 확인 항목
| 설치 대상 장비(Target equipment) | Quattro |
|---|---|
| 설치 장소(Place of installation) | Hawthorne, California |
| 비고(Remark) | ✓ Passive settings need to be rechecked |
| 최종 사용자(END USER) | Space-X |
운영자 및 일정
| Operator: Sungyoon Jung Date of setup: 25.03.26 Date of reporting: 25.03.26 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The resonant frequency of the DVIA-U1000 is high, so the passive settings need to be rechecked. The performance is slightly lacking, but it is operating normally.
Measurement date: 2025.03.26 (Wednesday)
Operator: DAEIL SYSTEMS Sungyoon Jung
Place of measurement: Hawthorne, California
End User: X-Space
Equipment Model:
Manufacturer: Thermo Fisher Scientific
Equipment: FIB-SEM
Model: Quattro
U1000 내부 프로그램 성능 측정 결과
Vertical
Left to Right
Front to Back
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일03-26-2025
태그
DVIA-U Series
Installation Report
Space-X
Thermo Fisher Scientific
Quattro
FIB-SEM
Hawthorne
California
DVIA-U1000
241204R5
관련 케이스 스터디

DVIA-ULF Series
Fujian Sanbao Steel Apreo 2C HiVac DVIA-U1000 (220718R9) Installation Report — Fujian
04-27-2023자세히

DVIA-ULF Series
YIMOTECH Thermo Fisher Helios 5CX FIB-SEM DVIA-ULF1000 Installation Report
07-13-2026자세히

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026자세히