설치 보고서
DVIA-M Series
09-20-2024
HITACHI SU8600 DVIA-M1000 (231219R3-3) Installation Report — Wuxi
DVIA-M Series
Installation Report
Huahong
HITACHI
SU8600
Wuxi
DVIA-M1000
231219R3-3
Contents
Huahong
Huahong
(M1000_ 231219R3-3 Set up)
현장 확인 항목
| Target equipment | HITACHI SU8600 |
|---|---|
| Place of installation | Wuxi |
| Remark | Good Performance |
| END USER | Huahong |
운영자 및 일정
Operator: Lee, Chaewon
Date of setup: 24.09.20
Date of reporting: 24.11.14
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.09.20 (Friday)
Operator: DAEIL SYSTEMS Chaewon Lee
Place of measurement: Wuxi
Equipment Model:
Manufacturer: HITACHI
Equipment: FE-SEM
Model: SU8600
5.
M1000 내부 프로그램 성능 측정 결과
Vertical
Left to Right
Front to Back
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일09-20-2024
태그
DVIA-M Series
Installation Report
Huahong
HITACHI
SU8600
Wuxi
DVIA-M1000
231219R3-3
관련 케이스 스터디

DVIA-M Series
Huahong Hitachi SU8600 FE-SEM DVIA-M1000 (231219R3-2) Installation Report
09-20-2024자세히

DVIA-M Series
YIMO HITACHI FE-SEM SU8600 DVIA-M1000 (240828R1-5) Installation Report
11-18-2024자세히

DVIA-M Series
Huangshan University HITACHI FE-SEM SU8600 DVIA-M1000 (230501R1) Installation Report
01-04-2024자세히