황산대학교 HITACHI FE-SEM SU8600 DVIA-M1000(230501R1) 설치 보고서
DVIA-M Series
Installation Report
Huangshan University
Huangshan
HITACHI
SU8600
FE-SEM
DVIA-M1000
230501R1
Contents
Huangshan University
Huangshan University
(M1000_ 230501R1 Set up)
현장 확인 항목
| Target equipment | SU8600 |
|---|---|
| Place of installation | Huangshan |
| Remark | Good Performance |
| END USER | Huangshan University |
운영자 및 일정
Operator: Park, Jongwon
Date of setup: 24.01.04
Date of reporting: 24.01.16
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.01.04 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Huangshan
Equipment Model: HITACHI FE-SEM SU8600
5.
M1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
작성일01-04-2024
태그
DVIA-M Series
Installation Report
Huangshan University
Huangshan
HITACHI
SU8600
FE-SEM
DVIA-M1000
230501R1