GRGT
GRGT
(M1000_ 230818R1-1 Set up)
현장 확인 항목
| Target equipment | Helios G5 CX DualBeam |
|---|---|
| Place of installation | Wuxi |
| Remark | Good Performance |
| END USER | GRGT |
운영자 및 일정
Operator: Park, Jongwon
Date of setup: 23.11.29
Date of reporting: 23.12.06
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.11.29 (Wednesday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Wuxi
Equipment Model: Thermo Fisher Scientific FIB-SEM Helios G5 CX DualBeam
5.
M1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일12-06-2023
태그
DVIA-M Series
Installation Report
GRGT
DVIA-M1000
230818R1-1
Thermo Fisher Scientific
Helios G5 CX
DualBeam
FIB-SEM
Wuxi
관련 케이스 스터디

DVIA-M Series
GRGT Shanghai Thermo Fisher Helios G5 CX DVIA-M1000 Internal Program Measurement
08-07-2024자세히

DVIA-M Series
YIMOTECH Thermo Fisher Scientific Helios 5CX FIB-SEM DVIA-M1000 Installation Report
07-02-2026자세히

DVIA-M Series
Peking University Shenzhen Graduate School Thermo Fisher Helios 5 CX FIB-SEM DVIA-M1000 (250613R3) Installation Report
11-11-2025자세히