Tianjin Zhuosheng Scios2 DVIA-M1000 (230626R1) Installation Report

DVIA-M Series
Installation Report
Tianjin Zhuosheng
DVIA-M1000
230626R1
Scios2
Tianjin

Tianjin Zhuosheng precision Machinery Technology Co., LTD

Tianjin Zhuosheng precision Machinery Technology Co., LTD

(M1000_ 230626R1 Set up)

현장 확인 항목

Target equipmentNONE
Place of installationTianjin
RemarkGood Performance
END USERTianjin Zhuosheng precision Machinery Technology Co., LTD

운영자 및 일정

Operator: Lee, Young Ha

Date of setup: 23.07.28

Date of reporting: 23.08.03

Date of business trip : 17.12.27~17.12.29

개요

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.07.28 (Friday)

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: Tianjin

Equipment Model: Scios2(Before installation)

5.

M1000 내부 프로그램 성능 측정 결과

Z axis

X axis

Y axis