설치 보고서
DVIA-M Series
07-06-2024
Custom Equipment STM DVIA-MO1000 (230608R2) Installation Report
DVIA-M Series
Installation Report
STM
Custom Equipment
DVIA-MO1000
230608R2
Contents
MO1000_230608R2 Set Up Report
현장 확인 항목
| Target equipment | STM |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
운영자 및 일정
Operator: Byeonghun Cho
Date of setup: 24.07.01
Date of reporting: 24.07.06
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-MO1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.07.01(Monday)
Operator: Byeonghun Cho from DAEIL SYSTEMS
Place of measurement: N / A
Equipment Model:
Manufacturer: Custom Equipment
Equipment: STM
5.
MB1000 내부 프로그램 성능 측정 결과
Vertical
Left to Right
Front to Back
이 케이스 스터디 공유하기