설치 보고서
DVIA-M Series
07-24-2023
PXW TESCAN SOLARIS GMH DVIA-M1000 (230501R3-4) Installation Report
DVIA-M Series
Installation Report
PXW
DVIA-M1000
230501R3-4
TESCAN
SOLARIS GMH
Shenzhen
Contents
PXW
PXW
(M1000_ 230501R3-4 Set up)
현장 확인 항목
| Target equipment | TESCAN SOLARIS GMH |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | PXW |
운영자 및 일정
Operator: Lee, Young Ha
Date of setup: 23.07.21
Date of reporting: 23.07.24
Date of business trip : 17.12.27~17.12.29
개요
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.07.21 (Friday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Shenzhen
Equipment Model: TESCAN SOLARIS GMH
5.
M1000 내부 프로그램 성능 측정 결과
Z axis
X axis
Y axis
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-M Series
작성일07-24-2023
태그
DVIA-M Series
Installation Report
PXW
DVIA-M1000
230501R3-4
TESCAN
SOLARIS GMH
Shenzhen