설치 보고서
DVIA-ULF Series
06-08-2023
BGRIMM Technology Group TESCAN VEGA GMS DVIA-U1000 (230202R1) Installation Report — Xiamen
DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1
목차
BGRIMM TECHNOLOGY GROUP
BGRIMM TECHNOLOGY GROUP
(U1000_ 230202R1 Set up)
현장 확인 항목
| Target equipment | TESCAN VEGA GMS |
|---|---|
| Place of installation | XIAMEN |
| Remark | Good Performance |
| END USER | BGRIMM TECHNOLOGY GROUP |
운영자 및 일정
| Operator: Yu, Hosang Date of setup: 23.06.07 Date of reporting: 22.06.12 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.06.08 (Thursday), Operator: DAEIL SYSTEMS, Hosang Yu Place of measurement: XIAMEN, China Equipment Model: TESCAN VEGA GMS
UB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일06-08-2023
태그
DVIA-U Series
Installation Report
BGRIMM Technology Group
TESCAN VEGA GMS
Xiamen
DVIA-U1000
230202R1
관련 케이스 스터디

DVIA-ULF Series
Fujian Zijin Liyuan Material Technology Sigma300 DVIA-U1000 (230620R3) Installation Report — Xiamen
07-27-2023자세히

DVIA-ULF Series
BGRIMM TECHNOLOGY GROUP TESCAN VEGA GMS DVIA-UB700 (230202R1) Installation Report
06-12-2023자세히

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026자세히