설치 보고서
DVIA-ULF Series
06-06-2023
Foshan Lehua Hengye Kitchen & Bath Co., LTD Sigma 300 DVIA-U1000 (230116R4) Installation Report — Changzhou
DVIA-U Series
Installation Report
Foshan Lehua Hengye Kitchen & Bath Co.
Sigma 300
Changzhou
DVIA-U1000
230116R4
목차
Foshan Lehua Hengye Kitchen & Bath Co., LTD
Foshan Lehua Hengye Kitchen & Bath Co., LTD
(U1000_ 230116R4 Set up)
현장 확인 항목
| Target equipment | Sigma 300 |
|---|---|
| Place of installation | CHANGZHOU |
| Remark | Good Performance |
| END USER | Foshan Lehua Hengye Kitchen & Bath Co., LTD |
운영자 및 일정
| Operator: Lee, Youngha Date of setup: 23.06.06 Date of reporting: 22.06.12 | Date of business trip : 17.12.27~17.12.29 |
|---|
개요
The DVIA-UB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.06.06 (Tuesday), Operator: DAEIL SYSTEMS, Youngha Lee Place of measurement: CHANGZHOU, China Equipment Model: Sigma 300
UB1000 내부 프로그램 성능 측정 결과
Z축
X축
Y축
이 케이스 스터디 공유하기
케이스 스터디 정보
카테고리
설치 보고서
시리즈DVIA-ULF Series
작성일06-06-2023
태그
DVIA-U Series
Installation Report
Foshan Lehua Hengye Kitchen & Bath Co.
Sigma 300
Changzhou
DVIA-U1000
230116R4
관련 케이스 스터디

DVIA-ULF Series
Goertek Inc. ZEISS Sigma 300 DVIA-U1000 (220919R6-1) Installation Report
01-07-2026자세히

DVIA-ULF Series
Foshan Lehua Hengye Kitchen & Bath Co., LTD Sigma 300 DVIA-UB700 (230116R4) Installation Report — Changzhou
06-06-2023자세히

DVIA-ULF Series
Shenzhen BYD Lithium Battery ZEISS Sigma 360 DVIA-U1000 (250107R2) Installation Report
05-18-2026자세히